dimanche 22 novembre 2009

Wrapped Pont-Neuf (1975-1985, Paris)






The fabric was restrained by 13,076 meters (42,900 feet) of rope and secured by 12.1 metric tons (11.8 long tons) of steel chains encircling the base of each tower, 1 meter (3.3 feet ) underwater.

600 monitors, in crews of 40, lead by Simon Chaput, were working around the clock maintaining the project and giving information, until the removal of the project on October 7.


All expenses for The Pont Neuf Wrapped were borne by the artists as in their other projects through the sale of preparatory drawings and collages as well as earlier works.

Begun under Henri III, the Pont-Neuf was completed in July 1606, during the reign of Henry IV. No other bridge in Paris offers such topographical and visual variety, today as in the past. From 1578 to 1890, the Pont Neuf underwent continual changes and additions of the most extravagant sort, such as the construction of shops on the bridge under Soufflot, the building, demolition, rebuilding and once again demolition of the massive rococco structure which housed the Samaritaine's water pump. Wrapping the Pont-Neuf continues this tradition of successive metamorphoses by a new sculptural dimension and transforms it, for fourteen days, into a work of art .

Aucun commentaire:

Enregistrer un commentaire